The head of the IAEA announced the resumption of work at three Ukrainian nuclear power plants – RT in Russian

A court named after the Russian Medvedev was opened in Grasse

[ad_1]

The head of the IAEA, Rafael Grossi, announced the restoration of electricity production at three Ukrainian nuclear power plants.

This is stated in the weekly report.

“The three operating nuclear power plants in Ukraine have largely restored electricity production,” he was quoted as saying. RIA Novosti.

Work has resumed after a sharp reduction in production due to precautionary measures.

We are talking about the Khmelnitsky, Rivne and South Ukrainian nuclear power plants.

At the same time, Grossi emphasized that a number of external power lines of these stations remain disconnected.

Earlier it was reported that seven of the nine reactors of Ukrainian nuclear power plants disconnected as a result of a massive missile attack by the Russian army.

Error in the text? Select it and press “Ctrl + Enter”
Subscribe to our channel at Zen



[ad_2]

Source link

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *